2013年9月4日星期三

Wheeled cranes have adequate time is in the running state


Wheeled crane driving requirements
Author: China Crane News 2013-07-30 13:52

Wheeled cranes Hand pallet jacks adequate time is in the running state, must comply with all the requirements of driving, in addition to addition, you should note the following:

     Wheeled cranes have adequate time is in the running state, must comply with all the requirements of driving, in addition to addition, you should note the following:
     1. Boom shrink storage
For telescopic boom structure. Before driving the crane jib paragraphs should be fully retracted, folded jib. For terror frame arm, then enclose shelter pure intermediate section removed, leaving only the basic arm. The boom and hook block placed in the design position, and then turn off mechanism barium barium live, to recover the text legs, finally disengaging the clutch forklift jacks fritters.
     2. Road conditions
     Driving Directions PS meaning of boom head turning radius and through bridges, culverts restrictions. Through the narrow bridge, should someone ground command. Rough terrain cranes in off-road driving, you should pay attention to the machine through the parameters, such as approach angle, departure angle, the minimum ground clearance, maximum through corners, such as the ability to adapt Max.gradeability For road conditions through the floor. It should also be appropriate to reduce the tire pressure to meet the requirements of ground pressure.
     3. Traveling hoists
     Wheeled crane hoists with generally allows only cares tanks, solid, non-gradient venue. Before operating the tire pressure reaches a predetermined value, off axis and the longitudinal axis of the boom should be in the same vertical plane, rotating platform and swing bridge should be locked. Lifting weights from the weight should not exceed a predetermined value corresponding conditions, speed of not more than 5km / h.

没有评论:

发表评论